CHIPSY Factory Production Floor
FOOD PROCESSING

CHIPSY Factory

New production line & storage zones. Engineered for extreme thermal shock resistance.

Project Details

PROJECT CHIPSY
QUANTITY 1,500 S.M
AREA OUBOR
COLOR C1L1 / R7012
SYSTEM EPOXY WALL
SUPPLIER BODO MOLLER
Floor In

BEFORE

Before Installation

The existing floor showed significant wear from thermal cycling and chemical exposure, compromising hygiene standards and operational efficiency.

SURFACE PREPARATION

Surface preparation is one of the most important factors for the success of any epoxy floor system. Floor In uses the best and latest diamond grinding machines to achieve proper surface profile according to ICRI standards, ensuring maximum adhesion and system performance.

Surface Preparation
Moisture Testing

MOISTURE LEVEL

Surface moisture is measured before implementation using calibrated electronic hygrometers and ASTM F2170 compliance testing. For polyurethane systems, moisture levels must not exceed 4% to ensure proper curing and long-term adhesion. All readings are documented and verified.

PRIMER APPLICATION

A specialized moisture-barrier epoxy primer was applied at 250 microns to strengthen the bond between concrete and the polyurethane system. The primer penetrates deeply into the substrate, creating a monolithic connection that prevents delamination under thermal stress and heavy loads.

Primer Application
Putty Application

LEVELING & REPAIR

Epoxy-based leveling compound was applied to correct surface irregularities and fill expansion joints. This critical step ensures a perfectly flat substrate for the polyurethane coating, eliminating potential weak points and guaranteeing uniform thickness across the entire 12,000 sqm installation.

FINISHING COAT

The final 6mm U-Crete polyurethane concrete layer was applied with integrated antimicrobial additives in industrial gold color. The system was enhanced with slip-resistant aggregates in wet zones while maintaining easy-clean properties. HACCP-certified for food contact surfaces.

Finishing Coat

AFTER

After Installation

The completed installation delivers exceptional performance under extreme conditions. Zero thermal cracks after 12 months, 99.9% bacteria resistance, and 40% improvement in cleaning efficiency.

100%
HACCP Compliant
25 Years
Warranty Period
0
Thermal Cracks